Wednesday, 12 October 2016

N's Closet

Hi!

It's Wednesday already!  Monday was (Canadian) Thanksgiving, so it was a day off for everyone.
We had a lovely dinner Sunday night at the In-laws.

We got a lot of rain and wind on Monday.  Not directly from Hurricane Matthew, but sort of.  According to our weather man, the rain came up from Matthew and met with a cold front here which made more wind.  A lot of people lost power (us only briefly) and it turns out, school was delayed an hour for us and closed all day for schools in the Eastern part of PEI.

Over the weekend, we got some work done in N's closet, which will have the hot water heater and pressure tank in the back half.
Here's K doing some wiring.

K had put a hole in the floor many years ago to get under the house in the winter.  We'd covered it with an extra piece of plywood (that you can see above under the black hose.) 

On the right side of the closet is the Electric panel. K put in new framing to bring the wall out.

New subfloor with no hole! 

Back of closet. The black hose is temporarily hooked up to the pipes that go to the new laundry closet.

Left side. 

Here the right wall is done and insulated.  Still have a bit more wiring to do so the vapor barrier plastic is not all taped up.

We had just enough flooring to go in the back part of the closet. I actually Tuck Taped two pieces together (see the white seam?), but it'll just be under our water stuff so it's all good!

K has gone to visit his sister this week, so the project is on hold.

Hope you're having a great week! :-)


No comments:

Post a Comment